👉What is the basic and important checklist for Beams in construction ?
🏷1. Design and Dimensions
Ensure the beam's size (length, width, and depth) are as per the structural drawings.
⏺Verify reinforcement details (number, size, and spacing of bars).
🏷2. Shuttering (Formwork)
⏺Check for proper alignment and tight joints to avoid concrete leakage.
⏺Apply shuttering oil for easy removal.
⏺Ensure supports and bracings are stable.
🏷3. Reinforcement
⏺Ensure correct placement of top, bottom, and extra bars.
⏺Verify stirrups spacing and diameter.
⏺Maintain proper lap length for overlapping bars.
🏷4. Clear Cover
⏺Use cover blocks to maintain required gaps:
⏺Bottom: 25-50 mm
Sides: 25 mm
⏺Top: 25 mm.
🏷5. Concreting
⏺Use the correct concrete miX.
⏺Pour concrete evenly and compact using a vibrator.
⏺Ensure smooth finishing on the top.
🏷6. Curing
⏺Start curing immediately after concreting.
⏺Continue curing for at least 7-14 days.
🏷7. Formwork Removal
⏺Remove the formwork only after the concrete has gained enough strength:
⏺Sides: 1-2 Days bottom: 7-14 days.
🏷8. Inspection
⏺Check for honeycombing or cracks and repair if necessary.
⏺Ensure no deflection or sagging after removing supports.
@etconp
🏷1. Design and Dimensions
Ensure the beam's size (length, width, and depth) are as per the structural drawings.
⏺Verify reinforcement details (number, size, and spacing of bars).
🏷2. Shuttering (Formwork)
⏺Check for proper alignment and tight joints to avoid concrete leakage.
⏺Apply shuttering oil for easy removal.
⏺Ensure supports and bracings are stable.
🏷3. Reinforcement
⏺Ensure correct placement of top, bottom, and extra bars.
⏺Verify stirrups spacing and diameter.
⏺Maintain proper lap length for overlapping bars.
🏷4. Clear Cover
⏺Use cover blocks to maintain required gaps:
⏺Bottom: 25-50 mm
Sides: 25 mm
⏺Top: 25 mm.
🏷5. Concreting
⏺Use the correct concrete miX.
⏺Pour concrete evenly and compact using a vibrator.
⏺Ensure smooth finishing on the top.
🏷6. Curing
⏺Start curing immediately after concreting.
⏺Continue curing for at least 7-14 days.
🏷7. Formwork Removal
⏺Remove the formwork only after the concrete has gained enough strength:
⏺Sides: 1-2 Days bottom: 7-14 days.
🏷8. Inspection
⏺Check for honeycombing or cracks and repair if necessary.
⏺Ensure no deflection or sagging after removing supports.